{"id":93755,"date":"2025-08-18T15:47:14","date_gmt":"2025-08-18T19:47:14","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=93755"},"modified":"2025-08-18T15:47:15","modified_gmt":"2025-08-18T19:47:15","slug":"travaux-routiers-et-fermeture-de-voie-sur-westminster-n","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/fr\/travaux-routiers-et-fermeture-de-voie-sur-westminster-n\/","title":{"rendered":"Travaux routiers et fermeture de voie sur Westminster N."},"content":{"rendered":"\n<p><strong>\u00c0 compter du 20 ao\u00fbt<\/strong>, la Ville proc\u00e9dera \u00e0 des r\u00e9parations n\u00e9cessaires du b\u00e9ton des trottoirs, des bordures et des barri\u00e8res sur Westminster, entre Radcliffe et Northview, ce qui n\u00e9cessitera la fermeture compl\u00e8te d\u2019une voie sur le pont CP (<em>The Hump<\/em>). Les travaux devraient durer jusqu\u2019\u00e0 la semaine\u00a0<strong>du 22 septembre 2025,<\/strong>\u00a0et la fermeture sera en vigueur jusqu\u2019\u00e0 la fin des travaux.<\/p>\n<p><em>* Ces dates sont susceptibles d\u2019\u00eatre modifi\u00e9es.<\/em><\/p>\n<h3>Circulation automobile<\/h3>\n<p>La circulation en direction sud sera maintenue en tout temps pendant les travaux. La circulation en direction nord sera d\u00e9vi\u00e9e par NDG et C\u00f4te Saint-Luc via Northview, Chester, l\u2019avenue Coronation et le chemin C\u00f4te Saint-Luc. Des panneaux temporaires seront install\u00e9s pour informer les automobilistes des d\u00e9tours \u00e0 emprunter.\u00a0 Veuillez respecter toute la signalisation temporaire.<\/p>\n<p>Nous vous sugg\u00e9rons de planifier vos d\u00e9placements en cons\u00e9quence. Les automobilistes doivent s\u2019attendre \u00e0 des ralentissements.<\/p>\n<h3>Contact<\/h3>\n<p>Si vous avez des questions, veuillez\u00a0<a href=\"https:\/\/montreal-west.ca\/fr\/notre-ville\/nous-joindre\/\" target=\"_blank\" rel=\"noopener\">joindre le Service des travaux publics<\/a>\u00a0ou appeler le 514-485-8597.<\/p>\n<p>Nous vous remercions de votre compr\u00e9hension.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00c0 compter du 20 ao\u00fbt, la Ville proc\u00e9dera \u00e0 des r\u00e9parations n\u00e9cessaires du b\u00e9ton des trottoirs, des bordures et des barri\u00e8res sur Westminster, entre Radcliffe et Northview, ce qui n\u00e9cessitera la fermeture compl\u00e8te d\u2019une voie sur le pont [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":42876,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[329],"tags":[],"class_list":["post-93755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-info-travaux"],"better_featured_image":{"id":42876,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":300,"height":225,"file":"2022\/02\/panneau-construction.png","sizes":{"thumbnail":{"file":"panneau-construction-285x225.png","width":285,"height":225,"mime-type":"image\/png","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2022\/02\/panneau-construction-285x225.png"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0"}},"post":42806,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2022\/02\/panneau-construction.png"},"acf":{"banner_img":false},"publishpress_future_action":{"enabled":false,"date":"2026-06-30 00:33:26","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/93755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/comments?post=93755"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/93755\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media\/42876"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media?parent=93755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/categories?post=93755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/tags?post=93755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}