{"id":79641,"date":"2024-08-12T14:56:24","date_gmt":"2024-08-12T18:56:24","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=79641"},"modified":"2024-08-19T12:13:42","modified_gmt":"2024-08-19T16:13:42","slug":"fermeture-du-chemin-avon","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/fr\/fermeture-du-chemin-avon\/","title":{"rendered":"FERMETURE DU CHEMIN AVON"},"content":{"rendered":"\n<p>MISE \u00c0 JOUR Le 19 ao\u00fbt 2024 : En raison des conditions m\u00e9t\u00e9orologiques, les travaux\u00a0d\u2019asphaltage du chemin Avon seront report\u00e9s<strong>.<\/strong>\u00a0Si la m\u00e9t\u00e9o le permet, les travaux reprendront demain, mardi 20 ao\u00fbt 2024. Le chemin Avon restera ouvert\u00a0 entre les avenues Westminster et Brock jusqu\u2019\u00e0 la reprise des travaux.<\/p>\n<p>\u00a0<\/p>\n<p>Le 12 ao\u00fbt 2024 : Des travaux de pavage du chemin Avon auront lieu les 16 et 19 ao\u00fbt 2024. Par cons\u00e9quent, le chemin Avon sera ferm\u00e9 entre les avenues Westminster et Brock, mais rouvrira la fin de semaine du 17 et 18 ao\u00fbt.<\/p>\n<p>*Veuillez noter que ces dates peuvent \u00eatre affect\u00e9es par des intemp\u00e9ries.<\/p>\n<p><span style=\"text-decoration: underline;\">Circulation des v\u00e9hicules<\/span><\/p>\n<p>Une signalisation de d\u00e9tour sera pr\u00e9sente pour assurer un flux de circulation s\u00e9curis\u00e9. Nous vous sugg\u00e9rons de planifier vos d\u00e9placements en cons\u00e9quence.<\/p>\n<p><u>D\u00e9tours<\/u><\/p>\n<ul>\n<li>En direction est sur la rue Saint-Jacques : le d\u00e9tour se fera via Prom. Ronald, av. Brock et boul. Sainte-Anne-De-Bellevue.<\/li>\n<li>En direction ouest sur la rue Saint-Jacques : le d\u00e9tour se fera via boul. Sainte-Anne-De-Bellevue, boul. Montr\u00e9al-Toronto, av. Ouellette.<\/li>\n<li>Acc\u00e9der \u00e0 Saint-Jacques depuis le nord (en contournant l&rsquo;intersection de l&rsquo;avenue Westminster et du ch. Avon) : le d\u00e9tour se fera via rue Northview, ave Connaught, rue Sherbrooke, et av. Elmhurst.<\/li>\n<li>Acc\u00e9der \u00e0 l&rsquo;avenue Westminster S. depuis le sud (en contournant l&rsquo;intersection de l&rsquo;av. Westminster et du ch. Avon) : le d\u00e9tour se fera via av. Elmhurst, rue Sherbrooke, av. Trenholme, et rue Northview.<\/li>\n<\/ul>\n<p>Les conducteurs doivent s&rsquo;attendre \u00e0 des ralentissements.<\/p>\n<p>Nous vous remercions de votre compr\u00e9hension.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>MISE \u00c0 JOUR Le 19 ao\u00fbt 2024 : En raison des conditions m\u00e9t\u00e9orologiques, les travaux\u00a0d\u2019asphaltage du chemin Avon seront report\u00e9s.\u00a0Si la m\u00e9t\u00e9o le permet, les travaux reprendront demain, mardi 20 ao\u00fbt 2024. Le chemin Avon restera ouvert\u00a0 entre [&hellip;]<\/p>\n","protected":false},"author":24,"featured_media":63054,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"page_builder":"","wds_primary_category":329,"footnotes":""},"categories":[329],"tags":[],"class_list":["post-79641","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-info-travaux"],"better_featured_image":{"id":63054,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":1080,"height":1920,"file":"2023\/08\/traffic-4.png","filesize":3290589,"sizes":{"medium":{"file":"traffic-4-558x992.png","width":558,"height":992,"mime-type":"image\/png","filesize":910133,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2023\/08\/traffic-4-558x992.png"},"thumbnail":{"file":"traffic-4-285x285.png","width":285,"height":285,"mime-type":"image\/png","filesize":136665,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2023\/08\/traffic-4-285x285.png"},"medium_large":{"file":"traffic-4-768x1365.png","width":768,"height":1365,"mime-type":"image\/png","filesize":1631870,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2023\/08\/traffic-4-768x1365.png"},"1536x1536":{"file":"traffic-4-864x1536.png","width":864,"height":1536,"mime-type":"image\/png","filesize":2015634,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2023\/08\/traffic-4-864x1536.png"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]}},"post":null,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2023\/08\/traffic-4.png"},"acf":{"banner_img":false},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/79641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/comments?post=79641"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/79641\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media\/63054"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media?parent=79641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/categories?post=79641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/tags?post=79641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}