{"id":44116,"date":"2022-03-28T20:51:13","date_gmt":"2022-03-29T00:51:13","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=44116"},"modified":"2025-07-10T11:23:16","modified_gmt":"2025-07-10T15:23:16","slug":"travaux-de-reamenagement-de-la-gare-montreal-ouest","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/fr\/travaux-de-reamenagement-de-la-gare-montreal-ouest\/","title":{"rendered":"Travaux de r\u00e9am\u00e9nagement de la gare Montr\u00e9al-Ouest"},"content":{"rendered":"\n<p><strong>Afin d\u2019am\u00e9liorer la s\u00e9curit\u00e9 et la fluidit\u00e9 des acc\u00e8s \u00e0 la gare Montr\u00e9al-Ouest, exo entreprendra des travaux d\u2019envergure qui consisteront \u00e0 construire un nouvel \u00e9dicule sur la rue Sherbrooke, prolonger le tunnel existant sous les voies, am\u00e9nager de fa\u00e7on permanente le nouveau quai nord, et fermer l\u2019acc\u00e8s aux quais depuis le passage \u00e0 niveau Westminster.<\/strong><\/p>\n<h3>Travaux pr\u00e9vus\u00a0<\/h3>\n<p><span style=\"text-decoration: underline;\">Mai 2022<\/span><\/p>\n<p>Exo proc\u00e8de pr\u00e9sentement \u00e0 l\u2019installation de murs de sout\u00e8nement et anticipe que cette importante \u00e9tape des travaux devrait se terminer \u00e0 la fin du mois de mai 2022. Le prochain bloc majeur de travaux est pr\u00e9vu pour le mois d\u2019ao\u00fbt 2022.<\/p>\n<p><span style=\"text-decoration: underline;\">Avril 2022<\/span><\/p>\n<p>Pour permettre le passage de la machinerie de chantier, et la construction des murs de sout\u00e8nement et de l\u2019\u00e9dicule, exo proc\u00e8dera, du 4 au 7 avril 2022, \u00e0 la coupe d\u2019arbres le long de la voie ferr\u00e9e, sur la rue Sherbrooke.<\/p>\n<p>Ces travaux sont effectu\u00e9s en conformit\u00e9 avec les permis \u00e9mis par l\u2019arrondissement CDN-NDG et la municipalit\u00e9 de Montr\u00e9al-Ouest.<\/p>\n<h3>Horaire des travaux<\/h3>\n<ul>\n<li>Les travaux se d\u00e9rouleront du printemps 2022, \u00e0 l\u2019\u00e9t\u00e9 2023<\/li>\n<li>Horaire *:\n<ul>\n<li>La semaine : de 7 h \u00e0 18 h<\/li>\n<li>La fin de semaine, selon l\u2019avancement du chantier : de 10 h \u00e0 18 h<\/li>\n<li>24 h : bloc majeur pr\u00e9vu \u00e0 la fin ao\u00fbt<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>*Exceptionnellement, si la situation l\u2019exige, les travaux pourront se poursuivre au-del\u00e0 des heures et jours pr\u00e9vus.<\/p>\n<h3>Nuisances possibles<\/h3>\n<p>Bien que tout soit mis en place pour minimiser l\u2019impact de ces travaux sur la qualit\u00e9 de vie des riverains, certaines nuisances sont appr\u00e9hend\u00e9es, comme : bruit de machinerie de chantier, vibrations, poussi\u00e8res, circulation de camions, d\u00e9viation de circulation, ou circulation en alternance sur la rue Sherbrooke.<\/p>\n<p>Exo vous remercie de votre compr\u00e9hension, et de votre patience durant ces travaux r\u00e9alis\u00e9s dans l\u2019int\u00e9r\u00eat collectif.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Afin d\u2019am\u00e9liorer la s\u00e9curit\u00e9 et la fluidit\u00e9 des acc\u00e8s \u00e0 la gare Montr\u00e9al-Ouest, exo entreprendra des travaux d\u2019envergure qui consisteront \u00e0 construire un nouvel \u00e9dicule sur la rue Sherbrooke, prolonger le tunnel existant sous les voies, am\u00e9nager de [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":44114,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[329],"tags":[],"class_list":["post-44116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-info-travaux"],"better_featured_image":{"id":44114,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":547,"height":348,"file":"2022\/03\/edicule-train.png","sizes":{"thumbnail":{"file":"edicule-train-285x285.png","width":285,"height":285,"mime-type":"image\/png","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2022\/03\/edicule-train-285x285.png"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]}},"post":null,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2022\/03\/edicule-train.png"},"acf":{"banner_img":false},"publishpress_future_action":{"enabled":false,"date":"2026-09-03 00:20:49","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/44116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/comments?post=44116"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/44116\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media\/44114"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media?parent=44116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/categories?post=44116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/tags?post=44116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}