{"id":35537,"date":"2021-07-05T09:12:39","date_gmt":"2021-07-05T13:12:39","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=35537"},"modified":"2021-07-05T09:12:42","modified_gmt":"2021-07-05T13:12:42","slug":"travaux-de-reconstruction-de-lavenue-fenwick","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/fr\/travaux-de-reconstruction-de-lavenue-fenwick\/","title":{"rendered":"Travaux de reconstruction de l&rsquo;avenue Fenwick"},"content":{"rendered":"\n<p>Cet \u00e9t\u00e9, la Ville entreprend une reconstruction compl\u00e8te d&rsquo;infrastructures sur toute la longueur de l&rsquo;avenue Fenwick. Ces travaux comprendront le remplacement des r\u00e9seaux d&rsquo;aqueduc et d&rsquo;\u00e9gout, l&rsquo;\u00e9clairage de rue ainsi que la reconstruction de chauss\u00e9e et des trottoirs.\u00a0<strong>Le projet doit commencer le 6 juillet<\/strong>\u00a0et la fin des travaux est pr\u00e9vue pour\u00a0mi-octobre.<\/p>\n<p>Pendant le projet, la rue sera ferm\u00e9e \u00e0 la circulation de transit et des perturbations mineures seront attendues sur les rues voisines (v\u00e9hicules de construction entrants et sortants, etc.) donc veuillez \u00e9viter le secteur autant que\u00a0possible. Pour votre s\u00e9curit\u00e9, nous souhaitons rappeler aux citoyens de respecter la signalisation temporaire et de suivre les consignes donn\u00e9es par l&rsquo;\u00e9quipe de travail sur place.\u00a0<\/p>\n<p>Pour plus de renseignements, vous pouvez consulter la page\u00a0<a href=\"https:\/\/montreal-west.ca\/fr\/services-aux-residents\/travaux-publics\/infrastructure\/\">Travaux d&rsquo;infrastructure<\/a>\u00a0qui sera tenue \u00e0 jour au cours\u00a0du projet. Nous continuerons de fournir aux citoyens dans la zone touch\u00e9e des informations cibl\u00e9es sous forme d&rsquo;avis livr\u00e9s \u00e0 leurs adresses.<\/p>\n<p>Si vous avez des questions, veuillez contacter le Service des travaux publics en utilisant le\u00a0<a href=\"https:\/\/montreal-west.ca\/fr\/notre-ville\/nous-joindre\/\">formulaire de contact de la Ville<\/a>\u00a0(veuillez indiquer \u00ab Renouvellement des infrastructures 2021 \u00bb en tant que sujet), ou en appelant le 514-485-8597.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cet \u00e9t\u00e9, la Ville entreprend une reconstruction compl\u00e8te d&rsquo;infrastructures sur toute la longueur de l&rsquo;avenue Fenwick. Ces travaux comprendront le remplacement des r\u00e9seaux d&rsquo;aqueduc et d&rsquo;\u00e9gout, l&rsquo;\u00e9clairage de rue ainsi que la reconstruction de chauss\u00e9e et des trottoirs.\u00a0Le [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":35538,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[101],"tags":[],"class_list":["post-35537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-travaux-publics"],"better_featured_image":{"id":35538,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":4032,"height":3024,"file":"2021\/07\/Picture.jpg","sizes":{"thumbnail":{"file":"Picture-285x285.jpg","width":285,"height":285,"mime-type":"image\/jpeg","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2021\/07\/Picture-285x285.jpg"},"medium":{"file":"Picture-992x744.jpg","width":992,"height":744,"mime-type":"image\/jpeg","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2021\/07\/Picture-992x744.jpg"},"medium_large":{"file":"Picture-768x576.jpg","width":768,"height":576,"mime-type":"image\/jpeg","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2021\/07\/Picture-768x576.jpg"},"large":{"file":"Picture-1920x1440.jpg","width":1920,"height":1440,"mime-type":"image\/jpeg","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2021\/07\/Picture-1920x1440.jpg"}},"image_meta":{"aperture":"2.2","credit":"","camera":"iPhone SE","caption":"","created_timestamp":"1561628376","copyright":"","focal_length":"4.15","iso":"25","shutter_speed":"0.00052002080083203","title":"","orientation":"1","keywords":[]}},"post":35537,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2021\/07\/Picture.jpg"},"acf":{"banner_img":false},"publishpress_future_action":{"enabled":false,"date":"2026-04-25 06:15:50","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/35537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/comments?post=35537"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/35537\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media\/35538"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media?parent=35537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/categories?post=35537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/tags?post=35537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}