{"id":35172,"date":"2021-06-21T08:19:32","date_gmt":"2021-06-21T12:19:32","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=35172"},"modified":"2021-06-21T08:19:58","modified_gmt":"2021-06-21T12:19:58","slug":"travaux-sur-lavenue-westminster-nord-entre-milner-et-curzon","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/fr\/travaux-sur-lavenue-westminster-nord-entre-milner-et-curzon\/","title":{"rendered":"Travaux sur l&rsquo;avenue Westminster Nord entre Milner et Curzon"},"content":{"rendered":"\n<p>La Ville de Montr\u00e9al-Ouest effectuera des travaux d&rsquo;asphaltage sur l&rsquo;avenue Westminster entre Milner et Curzon <strong>le lundi 28 juin et le mardi 29 juin 2021<\/strong>. Ces r\u00e9parations impliquent l&rsquo;application localis\u00e9e d&rsquo;asphalte et causeront tr\u00e8s peu de perturbations en ce qui concerne le bruit et la poussi\u00e8re.<\/p>\n<p>Pendant les travaux, la moiti\u00e9 de la route devra \u00eatre ferm\u00e9e. Cependant, <strong>la circulation bidirectionnelle sera maintenue en tout temps<\/strong>. Cela sera rendu possible par une interdiction de stationnement sur <u>les deux<\/u> c\u00f4t\u00e9s de la rue pendant deux jours. Ces restrictions entreront en vigueur \u00e0 6h30 le 28 juin et resteront en place jusqu&rsquo;\u00e0 la fin des travaux. Nous sugg\u00e9rons \u00e0 ceux qui ont besoin de stationnement d&rsquo;utiliser les terrains de stationnement municipaux gratuits \u00e0 proximit\u00e9 sur l&rsquo;avenue Westminster, l&rsquo;avenue Strathearn, et l&rsquo;avenue Percival.<\/p>\n<p>Les trottoirs sur Westminster ne seront pas touch\u00e9s par les travaux de r\u00e9paration et demeureront ouverts pendant la longueur du projet. Pareillement, l&rsquo;acc\u00e8s v\u00e9hiculaire aux all\u00e9es et ruelles sera maintenu.<\/p>\n<p>Si vous avez des questions ou pr\u00e9occupations, n&rsquo;h\u00e9sitez pas \u00e0 contacter le service des travaux publics au 514-485-8597, &#x74;&#x72;&#97;v&#x61;&#x75;&#120;pu&#x62;&#x6c;&#105;c&#x73;&#x40;&#109;&#111;n&#x74;&#x72;&#101;a&#x6c;&#x2d;&#119;&#101;s&#x74;&#x2e;&#99;a, ou par le <a href=\"https:\/\/montreal-west.ca\/fr\/notre-ville\/nous-joindre\/\">formulaire de contact<\/a>\u00a0(s\u00e9lectionner \u00ab travaux publics \u00bb comme le service). Nous vous remercions de votre collaboration pendant que nous travaillons pour maintenir nos infrastructures dans un bon \u00e9tat.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Ville de Montr\u00e9al-Ouest effectuera des travaux d&rsquo;asphaltage sur l&rsquo;avenue Westminster entre Milner et Curzon le lundi 28 juin et le mardi 29 juin 2021. Ces r\u00e9parations impliquent l&rsquo;application localis\u00e9e d&rsquo;asphalte et causeront tr\u00e8s peu de perturbations en [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":8571,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[101],"tags":[],"class_list":["post-35172","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-travaux-publics"],"better_featured_image":{"id":8571,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":49,"height":57,"file":"2019\/01\/Parking-pin.png","image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0"},"sizes":{}},"post":null,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2019\/01\/Parking-pin.png"},"acf":{"banner_img":false},"publishpress_future_action":{"enabled":false,"date":"2026-07-21 08:26:44","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/35172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/comments?post=35172"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/posts\/35172\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media\/8571"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/media?parent=35172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/categories?post=35172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/fr\/wp-json\/wp\/v2\/tags?post=35172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}