{"id":86071,"date":"2024-12-18T17:53:30","date_gmt":"2024-12-18T21:53:30","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=86071"},"modified":"2024-12-18T17:53:31","modified_gmt":"2024-12-18T21:53:31","slug":"planned-traffic-obstruction-on-westminster-ave-south-3","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/en\/planned-traffic-obstruction-on-westminster-ave-south-3\/","title":{"rendered":"Planned traffic obstruction on Westminster Ave. South"},"content":{"rendered":"\n<p>Please be advised that on <strong>Friday<\/strong>, <strong>January 3, 2025<\/strong>, Hydro-Qu\u00e9bec will be conducting maintenance work on one of the poles near the Town Hall to replace essential equipment. As a result, there will be a road closure on Westminster affecting southbound lanes from <strong>Ainslie <\/strong>to<strong> Avon<\/strong>.<\/p>\n<p>A detour will be in place, redirecting traffic via <strong>Broughton, Elmhurst, and Avon<\/strong>. The work is expected to last for the entire day.<\/p>\n<p>Signage will be present to ensure a secure traffic flow. We suggest that you plan your trips accordingly.<\/p>\n<p>Thank you for your understanding.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Please be advised that on Friday, January 3, 2025, Hydro-Qu\u00e9bec will be conducting maintenance work on one of the poles near the Town Hall to replace essential equipment. As a result, there will be a road closure on [&hellip;]<\/p>\n","protected":false},"author":24,"featured_media":42877,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"wds_primary_category":0,"footnotes":""},"categories":[328],"tags":[],"class_list":["post-86071","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-info-works"],"better_featured_image":{"id":42877,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":300,"height":225,"file":"2022\/02\/panneau-construction.png","sizes":{"thumbnail":{"file":"panneau-construction-285x225.png","width":285,"height":225,"mime-type":"image\/png","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2022\/02\/panneau-construction-285x225.png"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]}},"post":42804,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2022\/02\/panneau-construction.png"},"acf":{"banner_img":false},"publishpress_future_action":{"enabled":false,"date":"2026-06-07 03:44:58","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/posts\/86071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/comments?post=86071"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/posts\/86071\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/media\/42877"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/media?parent=86071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/categories?post=86071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/tags?post=86071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}