{"id":34205,"date":"2021-04-29T11:38:03","date_gmt":"2021-04-29T15:38:03","guid":{"rendered":"https:\/\/montreal-west.ca\/?p=34205"},"modified":"2021-04-29T11:38:05","modified_gmt":"2021-04-29T15:38:05","slug":"asphalt-resurfacing-of-avon-road","status":"publish","type":"post","link":"https:\/\/montreal-ouest.ca\/en\/asphalt-resurfacing-of-avon-road\/","title":{"rendered":"Asphalt Resurfacing of Avon Road"},"content":{"rendered":"\n<p>The Town of Montreal West will be\u00a0resurfacing the asphalt road surface and making localized repairs to the road foundation of Avon Road between Westminster South and Ronald Dr.\u00a0The project duration is estimated to take between 6 to 8 weeks, and it is anticipated that the project will commence in the month of May and be completed in the month of June.\u00a0<\/p>\n<p>During the work, please respect the temporary street signage, as well as the no parking signs. Existing no parking rules will continue to be enforced during the work. As with any project of this magnitude there will be some inconvenience.<\/p>\n<p>If you have any questions, please use\u00a0the form available <strong><a href=\"https:\/\/montreal-west.ca\/en\/our-town\/contact-the-town-and-opening-hours\/\">here<\/a><\/strong> and select\u00a0<em>Public Works<\/em>\u00a0in the service section, and\u00a0<em>Infrastructure works 2021<\/em>\u00a0as the subject.<\/p>\n<p>We appreciate your patience and understanding.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Town of Montreal West will be\u00a0resurfacing the asphalt road surface and making localized repairs to the road foundation of Avon Road between Westminster South and Ronald Dr.\u00a0The project duration is estimated to take between 6 to 8 [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":24590,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"page_builder":"","wds_primary_category":0,"footnotes":""},"categories":[62],"tags":[],"class_list":["post-34205","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-public-works"],"better_featured_image":{"id":24590,"alt_text":"","caption":"","description":"","media_type":"image","media_details":{"width":331,"height":331,"file":"2020\/06\/Detour.jpg","sizes":{"thumbnail":{"file":"Detour-285x285.jpg","width":285,"height":285,"mime-type":"image\/jpeg","source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2020\/06\/Detour-285x285.jpg"}},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]}},"post":24589,"source_url":"https:\/\/montreal-ouest.ca\/wp-content\/uploads\/2020\/06\/Detour.jpg"},"acf":{"banner_img":false},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/posts\/34205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/comments?post=34205"}],"version-history":[{"count":0,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/posts\/34205\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/media\/24590"}],"wp:attachment":[{"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/media?parent=34205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/categories?post=34205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/montreal-ouest.ca\/en\/wp-json\/wp\/v2\/tags?post=34205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}